Kitchen remodel day 7

jo paintingIts the small things

We have come a long way in a week. Living out of the one of our bedrooms. There has not been much sleep for me, I’ve left that up to jo and co. We got all the cabinets on the east wall installed along with the installation of the frig, microwave (w00t) and stove. Prop’s to pop, two weeks in a row, there is only one word to describe that man, HARDCORE. To Bean’s for keeping it real and rocking and rolling all weekend. And to Jil doing that painting oh so well. Only thing left is everything.

2 Replies to “Kitchen remodel day 7”

Leave a Reply

Your email address will not be published. Required fields are marked *